2014
A mixture of pitched path through erosion gullies, which were extensively landscaped. Along with a large number of remedial waterbars.
2011
During the construction of this upland footpath, definition, re-veging at altitude and pitching over bedrock slabs were the key factors of this contract.
2004-2006
Beinn Nuis – Pre-emptive construction of water bars, massive turfed side drains and large water bars in 10m eroded gully. Construction of 200m of aggregate path on open hillside. Extensive vegingof eroded gully, using undercutting of banks and creation of vegetation islands.