Constructed 48 waterbars over a failed machine path along with the revetment of a failed ditch. Work included massive off path turfed ditches.
2009
On a steep open slope we constructed an aggregate path that would wind up the slope whilst contain walkers on the way down. Massive off-path water bars were built to discharge water from 20m gully. These were 25-30m long and were extensively veged and landscaped to create vegetation islands.